CASE STUDY

Turnkey Critical Care Wing: 500-Bed National Institute

This project stands as a testament to Megasan's capability to deliver complex, high-stakes medical infrastructure on a national scale, ensuring patient safety and operational excellence.

Image of the hospital exterior or technical installation

The Challenge: Unprecedented Demand

The client required the **complete design, supply, and installation** of medical gas systems for a new 150-bed dedicated Critical Care Wing (ICU/NICU/HDU) within a six-month deadline. The primary challenge was integrating three distinct, large-capacity gas sources while maintaining zero downtime in the existing hospital facility.

Delivered Ahead of Schedule
100% System Purity Compliance
Training for 45+ Technicians
5-Year Comprehensive Warranty

Megasan Solution and Scope of Work

Central Gas Plants

Installed dual high-capacity PSA Oxygen Generators, Central Vacuum Plants, and Medical Air Compressors with automated backup manifolds.

MGPLS & Piping Network

Designed and installed over 5,000 meters of seamless copper piping network for O2, N2O, Medical Air, and Vacuum across 7 floors and 3 operating suites.

Safety & Monitoring

Integrated a centralized Digital Master Alarm System and 45 Zone Valve Boxes for segmented control, ensuring rapid response in emergencies.

"Megasan delivered not just equipment, but a guarantee of life support infrastructure. The professional project management and strict adherence to international safety standards made this our most successful infrastructure upgrade to date. Their after-sales support remains exemplary."

Dr. A. Chowdhury | Project Director, National Institute of Health