CASE STUDY
This project stands as a testament to Megasan's capability to deliver complex, high-stakes medical infrastructure on a national scale, ensuring patient safety and operational excellence.
The client required the **complete design, supply, and installation** of medical gas systems for a new 150-bed dedicated Critical Care Wing (ICU/NICU/HDU) within a six-month deadline. The primary challenge was integrating three distinct, large-capacity gas sources while maintaining zero downtime in the existing hospital facility.
Installed dual high-capacity PSA Oxygen Generators, Central Vacuum Plants, and Medical Air Compressors with automated backup manifolds.
Designed and installed over 5,000 meters of seamless copper piping network for O2, N2O, Medical Air, and Vacuum across 7 floors and 3 operating suites.
Integrated a centralized Digital Master Alarm System and 45 Zone Valve Boxes for segmented control, ensuring rapid response in emergencies.
"Megasan delivered not just equipment, but a guarantee of life support infrastructure. The professional project management and strict adherence to international safety standards made this our most successful infrastructure upgrade to date. Their after-sales support remains exemplary."
Copyright © Megasan Bangladesh Medical Industries Bangladesh Ltd, All Right Reserved.